Service & LEV testing
Every unit Dynamic Engineering has installed, where it is, and when it is next due back. A welding fume system has to hold the workplace under 1.0 mg/m³ and pull at least 0.5 m/s at the work — this is the list that says which ones have not been checked.
Past due
0
nothing outstanding
Falls due in 30 days
0
0 inside 90 days
Service book, 90 days
$0
at $245 a test, before filters and travel
Tagged out
0
0 more flagged at their last test
Past due 0 Next 30 days 0 Needs attention 0 In service 0 Everything 0
Grouped by site — and book it as one trip.
Nothing in that view.
0 units ticked.
Booking raises one job per site, so a trip to the Pilbara covers everything there in a single visit.
Recent tests
The last dozen performance tests, with the readings that set the result.
| Certificate | Unit | Tested | By | Capture | Filter Δp | Fume | Result |
|---|