Q-26-2171
Accepted Supply onlySupply — bottle and can drying tunnel, 2.4 m
Lines
Geraldton Engineering Works are on RRP. Margin is against landed cost.
| Code | Description | Qty | Unit | Amount | Cost | Margin | Free now |
|---|---|---|---|---|---|---|---|
| AD-TUN-BOTT-2P4 | Bottle and can drying tunnel, 2.4 m | 2 ea | $22,400.00 | $44,800.00 | $30,450.00 | 32% | 0 |
| DCT-TEE-200 | Equal tee Ø200 | 9 ea | $110.00 | $990.00 | $564.75 | 43% | 8 |
| DCT-RED-200160 | Reducer Ø200 → Ø160 | 11 ea | $90.00 | $990.00 | $564.41 | 43% | 9 |
| DCT-SDL-500 | Saddle take-off Ø500 | 10 ea | $320.00 | $3,200.00 | $1,793.00 | 44% | 11 |
| FRT-REGIONAL | Freight, regional WA | 1 ea | $425.00 | $425.00 | $340.00 | 20% | — |
| Freight, regional | $425.00 | ||||||
| Subtotal ex GST | $50,830.00 | ||||||
| GST 10% | $5,083.00 | ||||||
| Total inc GST | $55,913.00 | ||||||
The numbers
Sell, ex GST$50,830.00
Landed cost$33,712.16
Gross margin $17,117.84 · 33.7%
Who and where
Geraldton — main site
Geraldton WA · Mid West
Written 17 May 2024 by Zac Albert. Valid until 16 June 2024 .
Mark declined
Records why, and marks the enquiry lost if there is one.