Dynamic Engineering
Dynamic Engineering
Q-26-2183 Demo BHP Nickel West Kalgoorlie · Supply — wall mounted flexi-hose extraction arm ø160 × 3 m
5 agency brands MYOB · synced 9:14 am 08 Oct 2026

Q-26-2183

Accepted Supply only

Supply — wall mounted flexi-hose extraction arm ø160 × 3 m

Lines

BHP Nickel West Kalgoorlie are on Gold. Margin is against landed cost.

CodeDescriptionQtyUnitAmountCostMarginFree now
FE-ARMW160-3 Wall mounted flexi-hose extraction arm Ø160 × 3 m (Gold 22%) 1 ea $1,365.00 $1,365.00 $992.38 27% 3
FE-PMAX075-1 P-Max welding extraction fan 0.75 kW 1 PH (Gold 22%) 2 ea $1,677.00 $3,354.00 $2,580.20 23% 4
AD-KNIFE-300 ACI air knife 300 mm, stainless (Gold 21%) 3 ea $1,619.50 $4,858.50 $3,602.58 26% 4
DCT-BND200 Pressed bend 90° Ø200 (Gold 11%) 17 ea $71.20 $1,210.40 $754.12 38% 34
DCT-FLEX200 Flexible duct Ø200, aluminium laminate (Gold 11%) 24 m $53.40 $1,281.60 $747.12 42% 51
DCT-DMP-200 Butterfly damper Ø200, hand quadrant (Gold 11%) 1 ea $115.70 $115.70 $72.42 37% 20
FRT-REGIONAL Freight, regional WA (Gold 11%) 1 ea $378.25 $378.25 $340.00 10% —
Subtotal ex GST$12,563.45
GST 10%$1,256.35
Total inc GST$13,819.80

The numbers

Sell, ex GST$12,563.45
Landed cost$9,088.82
Gross margin $3,474.63 · 27.7%

Who and where

BHP Nickel West Kalgoorlie
Gavin Rowntree · g.rowntree@bhpnickelwestkalgo.com.au
45 days EOM
Kalgoorlie smelter — maintenance
Kalgoorlie WA · Goldfields
Written 19 Aug 2024 by Greg Albert. Valid until 18 Sept 2024 .