Q-26-2183
Accepted Supply onlySupply — wall mounted flexi-hose extraction arm ø160 × 3 m
Lines
BHP Nickel West Kalgoorlie are on Gold. Margin is against landed cost.
| Code | Description | Qty | Unit | Amount | Cost | Margin | Free now |
|---|---|---|---|---|---|---|---|
| FE-ARMW160-3 | Wall mounted flexi-hose extraction arm Ø160 × 3 m (Gold 22%) | 1 ea | $1,365.00 | $1,365.00 | $992.38 | 27% | 3 |
| FE-PMAX075-1 | P-Max welding extraction fan 0.75 kW 1 PH (Gold 22%) | 2 ea | $1,677.00 | $3,354.00 | $2,580.20 | 23% | 4 |
| AD-KNIFE-300 | ACI air knife 300 mm, stainless (Gold 21%) | 3 ea | $1,619.50 | $4,858.50 | $3,602.58 | 26% | 4 |
| DCT-BND200 | Pressed bend 90° Ø200 (Gold 11%) | 17 ea | $71.20 | $1,210.40 | $754.12 | 38% | 34 |
| DCT-FLEX200 | Flexible duct Ø200, aluminium laminate (Gold 11%) | 24 m | $53.40 | $1,281.60 | $747.12 | 42% | 51 |
| DCT-DMP-200 | Butterfly damper Ø200, hand quadrant (Gold 11%) | 1 ea | $115.70 | $115.70 | $72.42 | 37% | 20 |
| FRT-REGIONAL | Freight, regional WA (Gold 11%) | 1 ea | $378.25 | $378.25 | $340.00 | 10% | — |
| Subtotal ex GST | $12,563.45 | ||||||
| GST 10% | $1,256.35 | ||||||
| Total inc GST | $13,819.80 | ||||||
The numbers
Sell, ex GST$12,563.45
Landed cost$9,088.82
Gross margin $3,474.63 · 27.7%
Who and where
Kalgoorlie smelter — maintenance
Kalgoorlie WA · Goldfields
Written 19 Aug 2024 by Greg Albert. Valid until 18 Sept 2024 .
Mark declined
Records why, and marks the enquiry lost if there is one.