Dynamic Engineering
Dynamic Engineering
Q-26-2185 Demo Roy Hill Holdings · Supply — aer201 portable fume extractor
5 agency brands MYOB · synced 9:14 am 08 Oct 2026

Q-26-2185

Accepted Supply only

Supply — aer201 portable fume extractor

Lines

Roy Hill Holdings are on Gold. Margin is against landed cost.

CodeDescriptionQtyUnitAmountCostMarginFree now
FE-AER201 AER201 portable fume extractor (Gold 23%) 3 ea $4,389.00 $13,167.00 $9,920.28 25% -1
PC-NOZ-STD Safety air nozzle, standard (Gold 20%) 13 ea $220.00 $2,860.00 $1,609.01 44% 4
DCT-SP315-3 Spiral duct Ø315 × 3 m, galvanised (Gold 11%) 23 ea $200.25 $4,605.75 $3,214.94 30% 18
DCT-FLEX250 Flexible duct Ø250, aluminium laminate (Gold 11%) 11 m $66.75 $734.25 $430.87 41% 45
DCT-CLP-250 Duct clamp Ø250 with gasket (Gold 11%) 6 ea $26.70 $160.20 $90.48 44% 82
SPR-GASKET-SET Door and cartridge gasket set (Gold 22%) 21 set $222.30 $4,668.30 $2,692.83 42% 10
FRT-REGIONAL Freight, regional WA (Gold 11%) 1 ea $378.25 $378.25 $340.00 10% —
Subtotal ex GST$26,573.75
GST 10%$2,657.38
Total inc GST$29,231.13

The numbers

Sell, ex GST$26,573.75
Landed cost$18,298.41
Gross margin $8,275.34 · 31.1%

Who and where

Roy Hill Holdings
Damian Foulkes · d.foulkes@royhillholdings.com.au
45 days EOM
Roy Hill mine — heavy vehicle workshop
Newman WA · Pilbara
Written 15 Aug 2024 by Nicola Rock. Valid until 14 Sept 2024 .