DYNAMIC
Engineering Australia
Dynamic Engineering Australia Pty Ltd · ABN 66 298 989 406
7/52 Kent Street, Cannington WA 6107
+61 8 9356 7633 · sales@dynamiceng.com.au
Experts in ventilation systems · since 2002
7/52 Kent Street, Cannington WA 6107
+61 8 9356 7633 · sales@dynamiceng.com.au
Experts in ventilation systems · since 2002
Quotation
Q-26-2197
02 Dec 2024
Valid until 01 Jan 2025
Quotation to
CSBP Limited
ABN 80 950 155 636
Nadine Oakley
3 Colin Jamieson Way, Kwinana Beach WA
n.oakley@csbplimited.com.au
Site
Kwinana AN plant — change house
Kwinana Beach WA
Supply & install
Prepared by Nicola Rock
Supply and install — aer201 portable fume extractor
| Code | Description | Qty | Unit price | Amount |
|---|---|---|---|---|
| FE-AER201 | AER201 portable fume extractor Single-phase, wheel-around, for maintenance bays. | 1 ea | $4,389.00 | $4,389.00 |
| DCT-FLEX200 | Flexible duct Ø200, aluminium laminate | 6 m | $53.40 | $320.40 |
| DCT-CAP-100 | End cap Ø100 | 3 ea | $8.90 | $26.70 |
| DCT-BND450 | Pressed bend 90° Ø450 | 14 ea | $262.55 | $3,675.70 |
| DCT-SSCAP200 | End cap Ø200, 304 stainless | 6 ea | $62.30 | $373.80 |
| DCT-SPG-125 | Spigot Ø125, flanged | 13 ea | $22.25 | $289.25 |
| LAB-INSTALL | Installation, supply and fit | 25 h | $129.05 | $3,226.25 |
| LAB-EWP | Elevated work platform hire | 2 day | $378.25 | $756.50 |
| Subtotal ex GST | $13,057.60 | |||
| GST 10% | $1,305.76 | |||
| Total inc GST | $14,363.36 | |||
Terms
Payment 45 days EOM. Prices in Australian dollars, GST shown separately. This quotation is valid until 01 Jan 2025.
Installation includes commissioning and a performance test on handover, with the certificate issued to site.
Acceptance
To proceed, sign below and return, or reply to Nicola Rock confirming this quotation number.
Signed
Date
Dynamic Engineering Australia Pty Ltd · +61 8 9356 7633 · sales@dynamiceng.com.au · dynamiceng.com.au