Q-26-2212
Accepted Supply onlySupply — bottle and can drying tunnel, 2.4 m
Lines
Department of Education WA are on Silver. Margin is against landed cost.
| Code | Description | Qty | Unit | Amount | Cost | Margin | Free now |
|---|---|---|---|---|---|---|---|
| AD-TUN-BOTT-2P4 | Bottle and can drying tunnel, 2.4 m (Silver 14%) | 2 ea | $19,264.00 | $38,528.00 | $30,450.00 | 21% | 0 |
| DCT-TEE-400 | Equal tee Ø400 (Silver 7.5%) | 11 ea | $305.25 | $3,357.75 | $2,100.78 | 37% | 6 |
| FIX-ROD-M8 | Threaded rod M8 × 1 m (Silver 7.5%) | 13 ea | $18.50 | $240.50 | $119.21 | 50% | 22 |
| DCT-SPG-400 | Spigot Ø400, flanged (Silver 7.5%) | 13 ea | $152.63 | $1,984.19 | $1,153.10 | 42% | 18 |
| FRT-METRO | Delivery, Perth metro (Silver 7.5%) | 1 ea | $78.63 | $78.63 | $65.00 | 17% | — |
| Subtotal ex GST | $44,189.07 | ||||||
| GST 10% | $4,418.91 | ||||||
| Total inc GST | $48,607.98 | ||||||
The numbers
Sell, ex GST$44,189.07
Landed cost$33,888.09
Gross margin $10,300.98 · 23.3%
Who and where
Belmont City College — metalwork
Belmont WA · Perth metro
Written 07 Apr 2025 by Greg Albert. Valid until 07 May 2025 .
Mark declined
Records why, and marks the enquiry lost if there is one.