DYNAMIC
Engineering Australia
Dynamic Engineering Australia Pty Ltd · ABN 66 298 989 406
7/52 Kent Street, Cannington WA 6107
+61 8 9356 7633 · sales@dynamiceng.com.au
Experts in ventilation systems · since 2002
7/52 Kent Street, Cannington WA 6107
+61 8 9356 7633 · sales@dynamiceng.com.au
Experts in ventilation systems · since 2002
Quotation
Q-26-2237
03 Nov 2025
Valid until 03 Dec 2025
Quotation to
Blackwoods Welshpool
ABN 92 274 835 836
Vicki Lansdowne
5 Great Eastern Road, Welshpool WA
v.lansdowne@blackwoodswelshpoo.com.au
Site
Welshpool — main site
Welshpool WA
Supply & install
Prepared by Zac Albert
Supply and install — jetblack hybrid personnel cleaning booth bh05-c-3
| Code | Description | Qty | Unit price | Amount |
|---|---|---|---|---|
| PC-BH05C3 | JetBlack Hybrid Personnel Cleaning Booth BH05-C-3 Three-sided hybrid booth, no compressed air. Goes into mine site and fertiliser plant change-out areas. | 2 ea | $30,076.00 | $60,152.00 |
| DCT-BND250 | Pressed bend 90° Ø250 | 14 ea | $89.25 | $1,249.50 |
| DCT-CLP-500 | Duct clamp Ø500 with gasket | 8 ea | $110.50 | $884.00 |
| GRL-BIRD-200 | Bird mesh guard Ø200 | 8 ea | $38.25 | $306.00 |
| LAB-INSTALL | Installation, supply and fit | 22 h | $123.25 | $2,711.50 |
| Aerovent axial fan package, ex Melbourne — freight included | 1 | $2,500.00 | $2,500.00 | |
| LAB-EWP | Elevated work platform hire | 1 day | $361.25 | $361.25 |
| Subtotal ex GST | $68,164.25 | |||
| GST 10% | $6,816.43 | |||
| Total inc GST | $74,980.68 | |||
Terms
Payment 30 days. Prices in Australian dollars, GST shown separately. This quotation is valid until 03 Dec 2025.
Installation includes commissioning and a performance test on handover, with the certificate issued to site.
Acceptance
To proceed, sign below and return, or reply to Zac Albert confirming this quotation number.
Signed
Date
Dynamic Engineering Australia Pty Ltd · +61 8 9356 7633 · sales@dynamiceng.com.au · dynamiceng.com.au