Dynamic Engineering
Dynamic Engineering
Quote Q-26-2306 Demo
5 agency brands MYOB · synced 9:14 am 08 Oct 2026
← Back to the quote Prints on the letterhead with the shell stripped out.
DYNAMIC
Engineering Australia
Dynamic Engineering Australia Pty Ltd · ABN 66 298 989 406
7/52 Kent Street, Cannington WA 6107
+61 8 9356 7633 · sales@dynamiceng.com.au
Experts in ventilation systems · since 2002
Quotation
Q-26-2306
03 Feb 2025
Valid until 05 Mar 2025
Quotation to
Department of Education WA
ABN 81 423 817 719
Andrew Pitcher
236 Rockingham Road, East Perth WA
a.pitcher@departmentofeducat.com.au
Site
Bunbury SHS — trades training centre
Bunbury WA
Supply only
Prepared by Greg Albert

Supply — uni 2.2h mobile welding fume extractor, 3 m aluminium arm

Validity lapsed, never came back to us.

CodeDescriptionQtyUnit priceAmount
FE-UNI22H UNI 2.2H mobile welding fume extractor, 3 m aluminium arm
Self-cleaning cartridge, 1,400 m³/h at the arm. The one that goes into most weld bays.
2 ea $9,222.50 $18,445.00
DCT-SP200-3 Spiral duct Ø200 × 3 m, galvanised 3 ea $129.50 $388.50
DCT-SP160-1 Spiral duct Ø160 × 1 m, galvanised 7 ea $13.88 $97.16
DCT-SP500-1 Spiral duct Ø500 × 1 m, galvanised 5 ea $69.38 $346.90
DCT-DMP-500 Butterfly damper Ø500, hand quadrant 14 ea $448.63 $6,280.82
FRT-REGIONAL Freight, regional WA 1 ea $393.13 $393.13
Freight$425.00
Subtotal ex GST$26,376.51
GST 10%$2,637.65
Total inc GST$29,014.16
Terms

Payment 30 days. Prices in Australian dollars, GST shown separately. This quotation is valid until 05 Mar 2025.

Supply only. Delivery ex Cannington unless freight is shown above.

Acceptance

To proceed, sign below and return, or reply to Greg Albert confirming this quotation number.

Signed
Date
Dynamic Engineering Australia Pty Ltd · +61 8 9356 7633 · sales@dynamiceng.com.au · dynamiceng.com.au