Dynamic Engineering
Dynamic Engineering
Q-26-2326 Demo CBH Group Kwinana Terminal · Supply, install and electrical — evo 3.2 welding fume extractor, 4 m arm, 3ph
5 agency brands MYOB · synced 9:14 am 08 Oct 2026

Q-26-2326

Expired Supply, install & electrical

Supply, install and electrical — evo 3.2 welding fume extractor, 4 m arm, 3ph

Lines

CBH Group Kwinana Terminal are on Silver. Margin is against landed cost.

CodeDescriptionQtyUnitAmountCostMarginFree now
FE-EVO32-4M-3PH EVO 3.2 welding fume extractor, 4 m arm, 3PH (Silver 15%) 1 ea $9,732.50 $9,732.50 $7,219.57 26% 0
Written in Commissioning and airflow balance by subcontractor (Written in) 1 $1,350.00 $1,350.00 $921.60 32% not stock
Written in Ductwork modification on site — labour and materials (Written in) 1 $2,600.00 $2,600.00 $1,626.40 37% not stock
LAB-INSTALL Installation, supply and fit (Silver 7.5%) 10 h $134.13 $1,341.30 $620.00 54% —
Subtotal ex GST$15,023.80
GST 10%$1,502.38
Total inc GST$16,526.18

The numbers

Sell, ex GST$15,023.80
Landed cost$10,387.57
Gross margin $4,636.23 · 30.9%

Who and where

CBH Group Kwinana Terminal
Helen Rasmussen · h.rasmussen@cbhgroupkwinanater.com.au
30 days
Kwinana Beach — main site
Kwinana Beach WA · Perth metro
Written 03 Oct 2025 by Greg Albert. Valid until 02 Nov 2025 .
Validity lapsed, never came back to us.