Q-26-2326
Expired Supply, install & electricalSupply, install and electrical — evo 3.2 welding fume extractor, 4 m arm, 3ph
Lines
CBH Group Kwinana Terminal are on Silver. Margin is against landed cost.
| Code | Description | Qty | Unit | Amount | Cost | Margin | Free now |
|---|---|---|---|---|---|---|---|
| FE-EVO32-4M-3PH | EVO 3.2 welding fume extractor, 4 m arm, 3PH (Silver 15%) | 1 ea | $9,732.50 | $9,732.50 | $7,219.57 | 26% | 0 |
| Written in | Commissioning and airflow balance by subcontractor (Written in) | 1 | $1,350.00 | $1,350.00 | $921.60 | 32% | not stock |
| Written in | Ductwork modification on site — labour and materials (Written in) | 1 | $2,600.00 | $2,600.00 | $1,626.40 | 37% | not stock |
| LAB-INSTALL | Installation, supply and fit (Silver 7.5%) | 10 h | $134.13 | $1,341.30 | $620.00 | 54% | — |
| Subtotal ex GST | $15,023.80 | ||||||
| GST 10% | $1,502.38 | ||||||
| Total inc GST | $16,526.18 | ||||||
The numbers
Sell, ex GST$15,023.80
Landed cost$10,387.57
Gross margin $4,636.23 · 30.9%
Who and where
Kwinana Beach — main site
Kwinana Beach WA · Perth metro
Written 03 Oct 2025 by Greg Albert. Valid until 02 Nov 2025 .
Validity lapsed, never came back to us.
Mark declined
Records why, and marks the enquiry lost if there is one.