Dynamic Engineering
Dynamic Engineering
Quote Q-26-2329 Demo
5 agency brands MYOB · synced 9:14 am 08 Oct 2026
← Back to the quote Prints on the letterhead with the shell stripped out.
DYNAMIC
Engineering Australia
Dynamic Engineering Australia Pty Ltd · ABN 66 298 989 406
7/52 Kent Street, Cannington WA 6107
+61 8 9356 7633 · sales@dynamiceng.com.au
Experts in ventilation systems · since 2002
Quotation
Q-26-2329
12 Nov 2025
Valid until 12 Dec 2025
Quotation to
Roy Hill Holdings
ABN 61 357 382 619
Damian Foulkes
151 Kewdale Road, Newman WA
d.foulkes@royhillholdings.com.au
Site
Newman — main site
Newman WA
Supply only
Prepared by Zac Albert

Supply — uni 2.2 welding fume extractor, 2 m arm, 1ph

Price — their own maintenance crew fabricated it

CodeDescriptionQtyUnit priceAmount
FE-UNI22-2M-1PH UNI 2.2 welding fume extractor, 2 m arm, 1PH 1 ea $9,555.00 $9,555.00
DCT-SP200-2 Spiral duct Ø200 × 2 m, galvanised 13 ea $31.15 $404.95
GRL-COWL-100 Weather cowl Ø100, galvanised 6 ea $35.60 $213.60
GRL-COWL-450 Weather cowl Ø450, galvanised 11 ea $400.50 $4,405.50
DCT-SSBND100 Pressed bend 90° Ø100, 304 stainless 3 ea $57.85 $173.55
FRT-REGIONAL Freight, regional WA 1 ea $378.25 $378.25
Freight$425.00
Subtotal ex GST$15,555.85
GST 10%$1,555.59
Total inc GST$17,111.44
Terms

Payment 45 days EOM. Prices in Australian dollars, GST shown separately. This quotation is valid until 12 Dec 2025.

Supply only. Delivery ex Cannington unless freight is shown above.

Acceptance

To proceed, sign below and return, or reply to Zac Albert confirming this quotation number.

Signed
Date
Dynamic Engineering Australia Pty Ltd · +61 8 9356 7633 · sales@dynamiceng.com.au · dynamiceng.com.au