Dynamic Engineering
Dynamic Engineering
Quote Q-26-2341 Demo
5 agency brands MYOB · synced 9:14 am 08 Oct 2026
← Back to the quote Prints on the letterhead with the shell stripped out.
DYNAMIC
Engineering Australia
Dynamic Engineering Australia Pty Ltd · ABN 66 298 989 406
7/52 Kent Street, Cannington WA 6107
+61 8 9356 7633 · sales@dynamiceng.com.au
Experts in ventilation systems · since 2002
Quotation
Q-26-2341
09 Apr 2026
Valid until 09 May 2026
Quotation to
Geraldton Engineering Works
ABN 81 567 231 421
Kathy Sim
236 Cockburn Way, Geraldton WA
kathy@geraldtonengineeri.com.au
Site
Geraldton — main site
Geraldton WA
Supply & install
Prepared by Zac Albert

Supply and install — uni 3.2 mobile welding fume extractor, 3 ph

Validity lapsed, never came back to us.

CodeDescriptionQtyUnit priceAmount
FE-UNI32 UNI 3.2 mobile welding fume extractor, 3 PH
Two-station capable. Heavy fabrication and gouging.
1 ea $14,800.00 $14,800.00
DCT-SP250-3 Spiral duct Ø250 × 3 m, galvanised 13 ea $180.00 $2,340.00
DCT-CAP-315 End cap Ø315 5 ea $65.00 $325.00
DCT-CLP-400 Duct clamp Ø400 with gasket 12 ea $90.00 $1,080.00
DCT-SSCAP630 End cap Ø630, 304 stainless 5 ea $445.00 $2,225.00
LAB-INSTALL Installation, supply and fit 10 h $145.00 $1,450.00
LAB-TRAVEL Travel, Perth metro 13 h $110.00 $1,430.00
Freight$425.00
Subtotal ex GST$24,075.00
GST 10%$2,407.50
Total inc GST$26,482.50
Terms

Payment 14 days. Prices in Australian dollars, GST shown separately. This quotation is valid until 09 May 2026.

Installation includes commissioning and a performance test on handover, with the certificate issued to site.

Acceptance

To proceed, sign below and return, or reply to Zac Albert confirming this quotation number.

Signed
Date
Dynamic Engineering Australia Pty Ltd · +61 8 9356 7633 · sales@dynamiceng.com.au · dynamiceng.com.au