DYNAMIC
Engineering Australia
Dynamic Engineering Australia Pty Ltd · ABN 66 298 989 406
7/52 Kent Street, Cannington WA 6107
+61 8 9356 7633 · sales@dynamiceng.com.au
Experts in ventilation systems · since 2002
7/52 Kent Street, Cannington WA 6107
+61 8 9356 7633 · sales@dynamiceng.com.au
Experts in ventilation systems · since 2002
Quotation
Q-26-2355
23 July 2026
Valid until 22 Aug 2026
Quotation to
Central Regional TAFE Geraldton
ABN 55 211 912 858
Sue Trevaskis
33 Rockingham Way, Geraldton WA
s.trevaskis@centralregionaltaf.com.au
Site
Geraldton — main site
Geraldton WA
Supply only
Prepared by Zac Albert
Supply — jetblack hybrid personnel cleaning booth bh05-c-3
| Code | Description | Qty | Unit price | Amount |
|---|---|---|---|---|
| PC-BH05C3 | JetBlack Hybrid Personnel Cleaning Booth BH05-C-3 Three-sided hybrid booth, no compressed air. Goes into mine site and fertiliser plant change-out areas. | 2 ea | $35,844.00 | $71,688.00 |
| DCT-SP100-6 | Spiral duct Ø100 × 6 m, galvanised | 14 ea | $32.38 | $453.32 |
| DCT-CAP-100 | End cap Ø100 | 7 ea | $9.25 | $64.75 |
| FIX-BCLAMP-M10 | Beam clamp M10 | 5 ea | $13.88 | $69.40 |
| DCT-RECT-500500 | Rectangular duct 500 × 500 × 1.2 m, galvanised | 2 ea | $226.63 | $453.26 |
| GRL-COWL-100 | Weather cowl Ø100, galvanised | 14 ea | $37.00 | $518.00 |
| FRT-REGIONAL | Freight, regional WA | 1 ea | $393.13 | $393.13 |
| Freight | $425.00 | |||
| Subtotal ex GST | $74,064.86 | |||
| GST 10% | $7,406.49 | |||
| Total inc GST | $81,471.35 | |||
Terms
Payment 30 days. Prices in Australian dollars, GST shown separately. This quotation is valid until 22 Aug 2026.
Supply only. Delivery ex Cannington unless freight is shown above.
Acceptance
To proceed, sign below and return, or reply to Zac Albert confirming this quotation number.
Signed
Date
Dynamic Engineering Australia Pty Ltd · +61 8 9356 7633 · sales@dynamiceng.com.au · dynamiceng.com.au