Q-26-2366
Draft Supply, install & electricalSupply, install and electrical — site measure, design and shop drawings
What happens when this is accepted
- · A job is raised against Pilbara Fabrication Services at Karratha — main site.
- · 0 lines of stock are committed off the shelf.
- · 3 written-in lines come across as lines and never touch stock.
- · It lands on To pick — everything on it is free on the shelf.
- · The install is pencilled in.
Lines
Pilbara Fabrication Services are on Bronze. Margin is against landed cost.
| Code | Description | Qty | Unit | Amount | Cost | Margin | Free now |
|---|---|---|---|---|---|---|---|
| Written in | Site measure, design and shop drawings (Written in) | 1 | $1,550.00 | $1,550.00 | $897.60 | 42% | not stock |
| Written in | Commissioning and airflow balance by subcontractor (Written in) | 1 | $1,400.00 | $1,400.00 | $1,017.60 | 27% | not stock |
| Written in | Aerovent spare impeller — part number to be confirmed with Bayswater (Written in) | 1 | $615.00 | $615.00 | $449.40 | 27% | not stock |
| LAB-INSTALL | Installation, supply and fit (Bronze 4%) | 16 h | $139.20 | $2,227.20 | $992.00 | 55% | — |
| LAB-TRAVEL | Travel, Perth metro (Bronze 4%) | 15 h | $105.60 | $1,584.00 | $810.00 | 49% | — |
| Freight, regional | $425.00 | ||||||
| Subtotal ex GST | $7,801.20 | ||||||
| GST 10% | $780.12 | ||||||
| Total inc GST | $8,581.32 | ||||||
The numbers
Sell, ex GST$7,801.20
Landed cost$4,166.60
Gross margin $3,634.60 · 46.6%
Who and where
Karratha — main site
Karratha WA · Pilbara
Written 03 Aug 2026 by Greg Albert. Valid until 02 Sept 2026 .
Mark declined
Records why, and marks the enquiry lost if there is one.