Dynamic Engineering
Dynamic Engineering
Q-26-2366 Demo Pilbara Fabrication Services · Supply, install and electrical — site measure, design and shop drawings
5 agency brands MYOB · synced 9:14 am 08 Oct 2026

Q-26-2366

Draft Supply, install & electrical

Supply, install and electrical — site measure, design and shop drawings

Print / PDF
What happens when this is accepted
  • · A job is raised against Pilbara Fabrication Services at Karratha — main site.
  • · 0 lines of stock are committed off the shelf.
  • · 3 written-in lines come across as lines and never touch stock.
  • · It lands on To pick — everything on it is free on the shelf.
  • · The install is pencilled in.

Lines

Pilbara Fabrication Services are on Bronze. Margin is against landed cost.

CodeDescriptionQtyUnitAmountCostMarginFree now
Written in Site measure, design and shop drawings (Written in) 1 $1,550.00 $1,550.00 $897.60 42% not stock
Written in Commissioning and airflow balance by subcontractor (Written in) 1 $1,400.00 $1,400.00 $1,017.60 27% not stock
Written in Aerovent spare impeller — part number to be confirmed with Bayswater (Written in) 1 $615.00 $615.00 $449.40 27% not stock
LAB-INSTALL Installation, supply and fit (Bronze 4%) 16 h $139.20 $2,227.20 $992.00 55% —
LAB-TRAVEL Travel, Perth metro (Bronze 4%) 15 h $105.60 $1,584.00 $810.00 49% —
Freight, regional$425.00
Subtotal ex GST$7,801.20
GST 10%$780.12
Total inc GST$8,581.32

The numbers

Sell, ex GST$7,801.20
Landed cost$4,166.60
Gross margin $3,634.60 · 46.6%

Who and where

Pilbara Fabrication Services
Mick Tarrant · m.tarrant@pilbarafabrication.com.au
30 days
Karratha — main site
Karratha WA · Pilbara
Written 03 Aug 2026 by Greg Albert. Valid until 02 Sept 2026 .