Q-26-2259
Accepted Supply & installSupply and install — evo 3.2 welding fume extractor, 4 m arm, 3ph
Lines
City of Stirling Depot are on Silver. Margin is against landed cost.
| Code | Description | Qty | Unit | Amount | Cost | Margin | Free now |
|---|---|---|---|---|---|---|---|
| FE-EVO32-4M-3PH | EVO 3.2 welding fume extractor, 4 m arm, 3PH (Silver 15%) | 1 ea | $9,732.50 | $9,732.50 | $7,219.57 | 26% | 0 |
| DCT-SP125-3 | Spiral duct Ø125 × 3 m, galvanised (Silver 7.5%) | 7 ea | $23.13 | $161.91 | $101.29 | 37% | -4 |
| DCT-FLEX450 | Flexible duct Ø450, aluminium laminate (Silver 7.5%) | 15 m | $198.88 | $2,983.20 | $1,749.75 | 41% | 39 |
| DCT-SSBND100 | Pressed bend 90° Ø100, 304 stainless (Silver 7.5%) | 3 ea | $60.13 | $180.39 | $117.42 | 35% | 4 |
| DCT-SS250-1 | Spiral duct Ø250 × 1 m, 304 stainless (Silver 7.5%) | 2 ea | $55.50 | $111.00 | $73.02 | 34% | -13 |
| DCT-SSCLP250 | Duct clamp Ø250, stainless with gasket (Silver 7.5%) | 14 ea | $87.88 | $1,230.32 | $706.44 | 43% | 15 |
| DCT-FLG-100 | Flange ring Ø100, drilled (Silver 7.5%) | 11 ea | $18.50 | $203.50 | $121.22 | 40% | 12 |
| LAB-INSTALL | Installation, supply and fit (Silver 7.5%) | 20 h | $134.13 | $2,682.60 | $1,240.00 | 54% | — |
| LAB-EWP | Elevated work platform hire (Silver 7.5%) | 1 day | $393.13 | $393.13 | $320.00 | 19% | — |
| Subtotal ex GST | $17,678.55 | ||||||
| GST 10% | $1,767.86 | ||||||
| Total inc GST | $19,446.41 | ||||||
The numbers
Sell, ex GST$17,678.55
Landed cost$11,648.71
Gross margin $6,029.84 · 34.1%
Who and where
Balcatta depot — plant workshop
Balcatta WA · Perth metro
Written 18 May 2026 by Nicola Rock. Valid until 17 June 2026 .
Mark declined
Records why, and marks the enquiry lost if there is one.