Dynamic Engineering
Dynamic Engineering
Quote Q-26-2351 Demo
5 agency brands MYOB · synced 9:14 am 08 Oct 2026
← Back to the quote Prints on the letterhead with the shell stripped out.
DYNAMIC
Engineering Australia
Dynamic Engineering Australia Pty Ltd · ABN 66 298 989 406
7/52 Kent Street, Cannington WA 6107
+61 8 9356 7633 · sales@dynamiceng.com.au
Experts in ventilation systems · since 2002
Quotation
Q-26-2351
27 July 2026
Valid until 26 Aug 2026
Quotation to
CSBP Limited
ABN 80 950 155 636
Nadine Oakley
3 Colin Jamieson Way, Kwinana Beach WA
n.oakley@csbplimited.com.au
Site
Kwinana AN plant — change house
Kwinana Beach WA
Supply, install & electrical
Prepared by Greg Albert

Supply, install and electrical — uni 2.2h mobile welding fume extractor, 3 m aluminium arm

CodeDescriptionQtyUnit priceAmount
FE-UNI22H UNI 2.2H mobile welding fume extractor, 3 m aluminium arm
Self-cleaning cartridge, 1,400 m³/h at the arm. The one that goes into most weld bays.
1 ea $8,463.00 $8,463.00
Supply, install and electrical — turnkey, per scope letter 1 $10,900.00 $10,900.00
Electrical installation — isolators, cabling and connection by others 1 $3,450.00 $3,450.00
LAB-INSTALL Installation, supply and fit 18 h $129.05 $2,322.90
Subtotal ex GST$25,135.90
GST 10%$2,513.59
Total inc GST$27,649.49
Terms

Payment 45 days EOM. Prices in Australian dollars, GST shown separately. This quotation is valid until 26 Aug 2026.

Supply only. Delivery ex Cannington unless freight is shown above.

Acceptance

To proceed, sign below and return, or reply to Greg Albert confirming this quotation number.

Signed
Date
Dynamic Engineering Australia Pty Ltd · +61 8 9356 7633 · sales@dynamiceng.com.au · dynamiceng.com.au