Dynamic Engineering
Dynamic Engineering
Q-26-2351 Demo CSBP Limited · Supply, install and electrical — uni 2.2h mobile welding fume extractor, 3 m aluminium arm
5 agency brands MYOB · synced 9:14 am 08 Oct 2026

Q-26-2351

Sent Supply, install & electrical Past its validity

Supply, install and electrical — uni 2.2h mobile welding fume extractor, 3 m aluminium arm

Print / PDF
What happens when this is accepted
  • · A job is raised against CSBP Limited at Kwinana AN plant — change house.
  • · 1 lines of stock are committed off the shelf.
  • · 2 written-in lines come across as lines and never touch stock.
  • · It lands on To pick — everything on it is free on the shelf.
  • · The install is pencilled in.

Lines

CSBP Limited are on Gold. Margin is against landed cost.

CodeDescriptionQtyUnitAmountCostMarginFree now
FE-UNI22H UNI 2.2H mobile welding fume extractor, 3 m aluminium arm (Gold 22%) 1 ea $8,463.00 $8,463.00 $6,721.33 21% 1
Written in Supply, install and electrical — turnkey, per scope letter (Written in) 1 $10,900.00 $10,900.00 $9,137.20 16% not stock
Written in Electrical installation — isolators, cabling and connection by others (Written in) 1 $3,450.00 $3,450.00 $2,680.00 22% not stock
LAB-INSTALL Installation, supply and fit (Gold 11%) 18 h $129.05 $2,322.90 $1,116.00 52% —
Subtotal ex GST$25,135.90
GST 10%$2,513.59
Total inc GST$27,649.49

The numbers

Sell, ex GST$25,135.90
Landed cost$19,654.53
Gross margin $5,481.37 · 21.8%

Who and where

CSBP Limited
Nadine Oakley · n.oakley@csbplimited.com.au
45 days EOM
Kwinana AN plant — change house
Kwinana Beach WA · Perth metro
Written 27 July 2026 by Greg Albert. Valid until 26 Aug 2026 .

Acceptance link

The link that went out with the quote. Open it to see what the customer sees — no email needed.

/q/q2623512ijq2