Q-26-2353
Sent Supply only Past its validitySpares and filters — f9 panel filter 287 × 592
What happens when this is accepted
- · A job is raised against BHP Nickel West Kalgoorlie at Kalgoorlie smelter — maintenance.
- · 3 lines of stock are committed off the shelf.
- · It lands on Awaiting stock, because 1 line is short.
Heads up: 1 line is not
free on the shelf today — SPR-MOTOR-11. It will still accept; the
shortfall shows on replenishment, and the goods still
go out — nothing here blocks an invoice for want of stock.
Lines
BHP Nickel West Kalgoorlie are on Gold. Margin is against landed cost.
| Code | Description | Qty | Unit | Amount | Cost | Margin | Free now |
|---|---|---|---|---|---|---|---|
| FLT-F9-287592 | F9 panel filter 287 × 592 (Gold 11%) | 4 ea | $173.55 | $694.20 | $423.92 | 39% | 14 |
| SPR-MOTOR-11 | Replacement motor 11 kW B14 flange (Gold 11%) | 4 ea | $3,026.00 | $12,104.00 | $7,921.88 | 35% | 1 |
| PC-NOZ-HIGHFL | Safety air nozzle, high flow (Gold 20%) | 1 ea | $324.00 | $324.00 | $181.57 | 44% | 15 |
| FRT-METRO | Delivery, Perth metro (Gold 11%) | 1 ea | $75.65 | $75.65 | $65.00 | 14% | — |
| Freight, regional | $425.00 | ||||||
| Subtotal ex GST | $13,622.85 | ||||||
| GST 10% | $1,362.29 | ||||||
| Total inc GST | $14,985.14 | ||||||
The numbers
Sell, ex GST$13,622.85
Landed cost$8,592.37
Gross margin $5,030.48 · 36.9%
Who and where
Kalgoorlie smelter — maintenance
Kalgoorlie WA · Goldfields
Written 30 July 2026 by Zac Albert. Valid until 29 Aug 2026 .
Acceptance link
The link that went out with the quote. Open it to see what the customer sees — no email needed.
/q/q2623532ijq2Mark declined
Records why, and marks the enquiry lost if there is one.