Dynamic Engineering
Dynamic Engineering
Q-26-2353 Demo BHP Nickel West Kalgoorlie · Spares and filters — f9 panel filter 287 × 592
5 agency brands MYOB · synced 9:14 am 08 Oct 2026

Q-26-2353

Sent Supply only Past its validity

Spares and filters — f9 panel filter 287 × 592

Print / PDF
What happens when this is accepted
  • · A job is raised against BHP Nickel West Kalgoorlie at Kalgoorlie smelter — maintenance.
  • · 3 lines of stock are committed off the shelf.
  • · It lands on Awaiting stock, because 1 line is short.
Heads up: 1 line is not free on the shelf today — SPR-MOTOR-11. It will still accept; the shortfall shows on replenishment, and the goods still go out — nothing here blocks an invoice for want of stock.

Lines

BHP Nickel West Kalgoorlie are on Gold. Margin is against landed cost.

CodeDescriptionQtyUnitAmountCostMarginFree now
FLT-F9-287592 F9 panel filter 287 × 592 (Gold 11%) 4 ea $173.55 $694.20 $423.92 39% 14
SPR-MOTOR-11 Replacement motor 11 kW B14 flange (Gold 11%) 4 ea $3,026.00 $12,104.00 $7,921.88 35% 1
PC-NOZ-HIGHFL Safety air nozzle, high flow (Gold 20%) 1 ea $324.00 $324.00 $181.57 44% 15
FRT-METRO Delivery, Perth metro (Gold 11%) 1 ea $75.65 $75.65 $65.00 14% —
Freight, regional$425.00
Subtotal ex GST$13,622.85
GST 10%$1,362.29
Total inc GST$14,985.14

The numbers

Sell, ex GST$13,622.85
Landed cost$8,592.37
Gross margin $5,030.48 · 36.9%

Who and where

BHP Nickel West Kalgoorlie
Gavin Rowntree · g.rowntree@bhpnickelwestkalgo.com.au
45 days EOM
Kalgoorlie smelter — maintenance
Kalgoorlie WA · Goldfields
Written 30 July 2026 by Zac Albert. Valid until 29 Aug 2026 .

Acceptance link

The link that went out with the quote. Open it to see what the customer sees — no email needed.

/q/q2623532ijq2