Q-26-2363
Draft Supply & installSupply and install — jetblack wall mounted personnel cleaning station, 2.2 kw
What happens when this is accepted
- · A job is raised against CBH Group Kwinana Terminal at Kwinana Beach — main site.
- · 5 lines of stock are committed off the shelf.
- · It lands on Awaiting stock, because 2 lines are short.
- · The install is pencilled in.
Heads up: 2 lines are not
free on the shelf today — PC-STN-WALL-2P2, DCT-SSCAP100. It will still accept; the
shortfall shows on replenishment, and the goods still
go out — nothing here blocks an invoice for want of stock.
Lines
CBH Group Kwinana Terminal are on Silver. Margin is against landed cost.
| Code | Description | Qty | Unit | Amount | Cost | Margin | Free now |
|---|---|---|---|---|---|---|---|
| PC-STN-WALL-2P2 | JetBlack wall mounted personnel cleaning station, 2.2 kW (Silver 13%) | 1 ea | $11,527.50 | $11,527.50 | $8,485.46 | 26% | 0 |
| DCT-CLP-315 | Duct clamp Ø315 with gasket (Silver 7.5%) | 16 ea | $55.50 | $888.00 | $497.44 | 44% | 32 |
| DCT-FLEX450 | Flexible duct Ø450, aluminium laminate (Silver 7.5%) | 3 m | $198.88 | $596.64 | $349.95 | 41% | 39 |
| DCT-SSCAP100 | End cap Ø100, 304 stainless (Silver 7.5%) | 9 ea | $18.50 | $166.50 | $112.68 | 32% | 6 |
| DCT-SPG-100 | Spigot Ø100, flanged (Silver 7.5%) | 3 ea | $18.50 | $55.50 | $30.21 | 46% | 18 |
| LAB-INSTALL | Installation, supply and fit (Silver 7.5%) | 15 h | $134.13 | $2,011.95 | $930.00 | 54% | — |
| Subtotal ex GST | $15,246.09 | ||||||
| GST 10% | $1,524.61 | ||||||
| Total inc GST | $16,770.70 | ||||||
The numbers
Sell, ex GST$15,246.09
Landed cost$10,405.74
Gross margin $4,840.35 · 31.7%
Who and where
Kwinana Beach — main site
Kwinana Beach WA · Perth metro
Written 15 July 2026 by Greg Albert. Valid until 14 Aug 2026 .
Mark declined
Records why, and marks the enquiry lost if there is one.