Dynamic Engineering
Dynamic Engineering
Jobs Demo 28 open · $427,906
5 agency brands MYOB · synced 9:14 am 08 Oct 2026

Jobs

Every job from the day it is raised to the day it is invoiced. Drag a card across as it moves. Dropping one on Complete runs it for real: stock issued, hours booked, the invoice raised and queued for MYOB, and every unit that went in added to the service register with its next test twelve months out.

Open job book
$427,906
28 jobs, ex GST
Booked this week
0
$0
Past their date
26
scheduled before today, not away yet
Regional
12
Pilbara, Goldfields and the South West
159 jobs
JobCustomerSiteWhat WhoScheduledValueStatus
J-26-1727 Blackwoods Welshpool Welshpool — main site Supply — downdraft bench 1200 × 800 Zac Albert 18 Aug 2026 $8,255 Despatched
J-26-1718 WA Steel Fabricators Kwinana Beach — main site Supply, install and electrical — evo 3.2 welding fume extractor, 4 m arm, 3ph Greg Albert 24 Aug 2026 $26,810 Picked
J-26-1726 Fortescue Port Hedland Operations Port Hedland — main site Supply, install and electrical — aer201 portable fume extractor Nicola Rock 24 Aug 2026 $27,572 Despatched
J-26-1723 Geraldton Engineering Works Geraldton — main site Supply — aer201 portable fume extractor Zac Albert 13 Aug 2026 $29,535 Awaiting stock
J-26-1729 Gas & Supplies WA Bibra Lake — main site Supply and install — jetblack wall mounted personnel cleaning station, 2.2 kw Nicola Rock 21 Aug 2026 $22,245 Despatched
J-26-1713 Scania Western Australia Kewdale — main site Supply and install — aer201 portable fume extractor Nicola Rock 21 Aug 2026 $16,342 To pick
J-26-1712 Department of Fire & Emergency Services Belmont Fire Station Spares and filters — hepa h13 secondary filter Zac Albert 13 Aug 2026 $14,655 To pick
J-26-1709 Roy Hill Holdings Roy Hill camp — laundry de-dust Supply — uni 2.2 welding fume extractor, 2 m arm, 1ph Zac Albert 24 Aug 2026 $11,849 To pick
J-26-1734 South32 Worsley Alumina Collie — main site Supply — round tailpipe nozzle with clamp Nicola Rock 24 Aug 2026 $8,216 Complete
J-26-1738 Coventry Group Malaga Malaga — main site Supply and install — downdraft bench 1800 × 900 Nicola Rock 19 Aug 2026 $26,025 Invoiced
J-26-1737 Civmec Construction & Engineering Henderson Yard 2 — heavy bay Spares and filters — magnehelic gauge 0–2500 pa Zac Albert 17 Aug 2026 $2,434 Invoiced
J-26-1733 South32 Worsley Alumina Collie — main site Supply — armotech ø160 aluminium extraction arm, 3 m Greg Albert 24 Aug 2026 $6,684 Invoiced
J-26-1728 CSBP Limited Kwinana ammonia plant — maintenance workshop Supply, install and electrical — jetblack portable personnel cleaning station Nicola Rock 11 Aug 2026 $18,477 Despatched
J-26-1719 Total Tools Malaga Malaga — main site Supply, install and electrical — downdraft bench 1200 × 800 Nicola Rock 21 Aug 2026 $17,425 Picked
J-26-1714 Gas & Supplies WA Bibra Lake — main site Supply and install — jetblack stainless personnel cleaning booth Nicola Rock 10 Aug 2026 $48,408 To pick
J-26-1710 Fortescue Port Hedland Operations Port Hedland — machine shop Breakdown attendance Greg Albert 24 Aug 2026 $6,207 To pick
J-26-1730 Northern Territory Safety Supplies Winnellie — main site Supply — round tailpipe nozzle with clamp Nicola Rock 10 Aug 2026 $10,106 Despatched
J-26-1716 SA Ventilation Supplies Wingfield — main site Supply — arhv vehicle exhaust hose reel with fan, 10 m hose Zac Albert 17 Aug 2026 $15,572 Picked
J-26-1715 North Metropolitan TAFE Balga campus — metal fabrication Supply — wall mounted flexi-hose extraction arm ø160 × 1.5 m Zac Albert 24 Aug 2026 $22,205 Picked
J-26-1736 Total Tools Malaga Malaga — main site Supply — aer201 portable fume extractor Nicola Rock 12 Aug 2026 $14,314 Complete
J-26-1731 Coventry Group Malaga Malaga — main site Supply and install — evo 3.2 welding fume extractor, 4 m arm, 3ph Greg Albert 18 Aug 2026 $12,626 Despatched
J-26-1725 Alcoa of Australia Kwinana refinery — mechanical workshop Supply — p-max welding extraction fan 0.75 kw 3 ph Zac Albert 17 Aug 2026 $8,482 Awaiting stock
J-26-1735 Blackwoods Welshpool Welshpool — main site Supply — elemax portable vehicle exhaust fume extractor Zac Albert 24 Aug 2026 $14,362 Invoiced
J-26-1724 Roy Hill Holdings Roy Hill camp — laundry de-dust Spares and filters — f7 panel filter 490 × 592 Zac Albert 18 Aug 2026 $10,422 Awaiting stock
J-26-1720 Northern Territory Safety Supplies Winnellie — main site Spares and filters — replacement motor 0.75 kw b14 flange Greg Albert 14 Aug 2026 $3,967 Picked
J-26-1732 Coventry Group Malaga Malaga — main site Supply and install — jetblack portable personnel cleaning station Greg Albert 26 Aug 2026 $18,127 Despatched
J-26-1722 BHP Nickel West Kalgoorlie Kalgoorlie — main site Supply — downdraft bench 1200 × 800 Zac Albert 10 Aug 2026 $12,794 Awaiting stock
J-26-1717 Blackwoods Welshpool Welshpool — main site Supply — aci air knife 300 mm, stainless Nicola Rock 21 Aug 2026 $4,172 Picked
J-26-1711 Gas & Supplies WA Bibra Lake — main site Spares and filters — sliding hose balancer Nicola Rock 10 Aug 2026 $10,052 To pick
J-26-1708 SA Ventilation Supplies Wingfield — main site Supply, install and electrical — electrical installation — isolators, cabling and connection by others Greg Albert 10 Aug 2026 $14,466 To pick
J-26-1721 CSBP Limited Kwinana AN plant — change house Spares and filters — oval tailpipe nozzle, twin exhaust Nicola Rock 24 Aug 2026 $549 Awaiting stock
J-26-1707 SA Ventilation Supplies Wingfield — main site Supply — evo2.2 compact portable welding fume extractor, 2 m aluminium arm Zac Albert 20 Aug 2026 $14,057 To pick
J-26-1705 City of Stirling Depot Balcatta depot — plant workshop Spares and filters — f9 panel filter 287 × 287 Greg Albert 13 July 2026 $3,125 Invoiced
J-26-1706 Austal Ships Shipyard weld shop Supply — jetblack wall mounted personnel cleaning station Nicola Rock 22 July 2026 $28,328 Invoiced
J-26-1704 Water Corporation Balcatta water treatment workshop Supply, install and electrical — evo 3.2 welding fume extractor, 4 m arm, 3ph Zac Albert 06 July 2026 $17,888 Invoiced
J-26-1703 Total Tools Malaga Malaga — main site Supply, install and electrical — jetblack stainless personnel cleaning booth Zac Albert 01 July 2026 $55,750 Invoiced
J-26-1702 Civmec Construction & Engineering Henderson — main site Supply and install — arhv vehicle exhaust hose reel with fan, 10 m hose Nicola Rock 23 June 2026 $25,051 Invoiced
J-26-1701 Main Roads WA Welshpool Workshop Welshpool — main site Breakdown attendance Greg Albert 15 June 2026 $340 Invoiced
J-26-1700 CSBP Limited Kwinana AN plant — change house Supply — uni 2.2h mobile welding fume extractor, 3 m aluminium arm Zac Albert 03 June 2026 $33,067 Invoiced
J-26-1699 City of Stirling Depot Balcatta depot — plant workshop Supply and install — evo 3.2 welding fume extractor, 4 m arm, 3ph Nicola Rock 27 May 2026 $17,679 Invoiced
J-26-1698 Gas & Supplies WA Bibra Lake — main site Supply — safety air nozzle, standard Greg Albert 15 May 2026 $35,812 Invoiced
J-26-1697 SA Ventilation Supplies Wingfield — main site Supply — aer201 portable fume extractor Zac Albert 07 May 2026 $29,853 Invoiced
J-26-1696 Roy Hill Holdings Roy Hill mine — heavy vehicle workshop Spares and filters — tailpipe nozzle, round 100 mm Nicola Rock 04 May 2026 $4,157 Invoiced
J-26-1695 Alcoa of Australia Kwinana refinery — mechanical workshop Supply — cleaning station hose assembly, 3 m Nicola Rock 28 Apr 2026 $14,907 Invoiced
J-26-1694 City of Stirling Depot Balcatta — main site Supply — jetblack portable personnel cleaning station Zac Albert 20 Apr 2026 $44,222 Invoiced
J-26-1693 Total Tools Malaga Malaga — main site Spares and filters — auto-start welding current sensor Nicola Rock 13 Apr 2026 $7,779 Invoiced
J-26-1692 South32 Worsley Alumina Collie — main site Supply — arhv vehicle exhaust hose reel with fan, 10 m hose Greg Albert 06 Apr 2026 $17,583 Invoiced
J-26-1691 Total Tools Malaga Malaga — main site Supply — evo 3.2 welding fume extractor, 4 m arm, 3ph Zac Albert 24 Mar 2026 $18,529 Invoiced
J-26-1690 Gas & Supplies WA Bibra Lake — main site Supply — wall mounted flexi-hose extraction arm ø160 × 3 m Zac Albert 13 Mar 2026 $5,171 Invoiced
J-26-1689 Water Corporation Leederville — main site Spares and filters — vehicle exhaust hose ø150, high temperature Nicola Rock 09 Mar 2026 $2,079 Invoiced
J-26-1688 Department of Education WA Ellenbrook SC — metalwork Breakdown attendance Nicola Rock 23 Feb 2026 $2,109 Invoiced
J-26-1687 South32 Worsley Alumina Worsley refinery — boilermaker shop Supply — aci air knife 900 mm, stainless Greg Albert 16 Feb 2026 $11,435 Invoiced
J-26-1686 Civmec Construction & Engineering Australian Marine Complex fabrication hall Supply, install and electrical — jetblack bh03 personnel cleaning booth, powder coated Zac Albert 09 Feb 2026 $46,965 Invoiced
J-26-1685 Fortescue Port Hedland Operations Port Hedland — machine shop Supply and install — evo2.2 compact portable welding fume extractor, 2 m aluminium arm Greg Albert 30 Jan 2026 $22,598 Invoiced
J-26-1684 Geraldton Engineering Works Geraldton — main site Supply — evo2.2 compact portable welding fume extractor, 2 m aluminium arm Zac Albert 21 Jan 2026 $18,875 Invoiced
J-26-1682 CSBP Limited Kwinana Beach — main site Supply — apn1 wall mounted vehicle exhaust extractor, single, 10 m hose Zac Albert 31 Dec 2025 $24,091 Invoiced
J-26-1683 Gas & Supplies WA Bibra Lake — main site Spares and filters — f9 panel filter 287 × 592 Nicola Rock 08 Jan 2026 $1,653 Invoiced
J-26-1680 Water Corporation Balcatta water treatment workshop Supply and install — uni 2.2h mobile welding fume extractor, 3 m aluminium arm Zac Albert 15 Dec 2025 $16,447 Invoiced
J-26-1681 Hofmann Engineering Bassendean — main site Supply — downdraft bench 1200 × 800 Zac Albert 24 Dec 2025 $18,965 Invoiced
J-26-1679 Fortescue Port Hedland Operations Port Hedland — machine shop Supply, install and electrical — crane hire and rigging, half day Greg Albert 08 Dec 2025 $22,030 Invoiced
J-26-1678 Civmec Construction & Engineering Henderson Yard 2 — heavy bay Spares and filters — safety air nozzle, standard Greg Albert 26 Nov 2025 $3,397 Invoiced
J-26-1676 BHP Nickel West Kalgoorlie Kalgoorlie smelter — maintenance Supply, install and electrical — downdraft bench 1800 × 900 Zac Albert 04 Nov 2025 $18,891 Invoiced
J-26-1677 Blackwoods Welshpool Welshpool — main site Supply and install — jetblack hybrid personnel cleaning booth bh05-c-3 Zac Albert 13 Nov 2025 $68,164 Invoiced
J-26-1675 Alcoa of Australia Kwinana refinery — mechanical workshop Supply — wall mounted flexi-hose extraction arm ø160 × 3 m Zac Albert 28 Oct 2025 $10,018 Invoiced
J-26-1674 WesTrac Guildford Guildford component rebuild shop Supply — p-max welding extraction fan 0.75 kw 1 ph Nicola Rock 22 Oct 2025 $30,941 Invoiced
J-26-1673 VEEM Ltd Canning Vale — main site Supply — booth filter set, bh05 series Zac Albert 13 Oct 2025 $19,869 Invoiced
J-26-1672 Blackwoods Welshpool Welshpool — main site Spares and filters — cleaning station hose assembly, 3 m Greg Albert 03 Oct 2025 $3,211 Invoiced
J-26-1671 SA Ventilation Supplies Wingfield — main site Spares and filters — tailpipe nozzle, round 100 mm Greg Albert 22 Sept 2025 $7,481 Invoiced
J-26-1669 Roy Hill Holdings Roy Hill mine — heavy vehicle workshop Supply — jetblack wall mounted personnel cleaning station Zac Albert 09 Sept 2025 $47,556 Invoiced
J-26-1670 Kleenheat Gas Kwinana — main site Supply — powered roof exhaust fan ø450 Nicola Rock 19 Sept 2025 $2,212 Invoiced
J-26-1668 South32 Worsley Alumina Collie — main site Supply — aci air knife 300 mm, stainless Zac Albert 05 Sept 2025 $6,499 Invoiced
J-26-1667 Water Corporation Leederville — main site Supply — uni 3.2 mobile welding fume extractor, 3 ph Zac Albert 25 Aug 2025 $22,175 Invoiced
J-26-1666 Coventry Group Malaga Malaga — main site Breakdown attendance Nicola Rock 13 Aug 2025 $1,265 Invoiced
J-26-1665 Total Tools Malaga Malaga — main site Supply — jetblack wall mounted personnel cleaning station Nicola Rock 05 Aug 2025 $49,319 Invoiced
J-26-1664 CSBP Limited Kwinana Beach — main site Supply — oval tailpipe nozzle, twin exhaust Zac Albert 28 July 2025 $5,485 Invoiced
J-26-1663 Coventry Group Malaga Malaga — main site Spares and filters — replacement impeller ø315 Greg Albert 22 July 2025 $15,439 Invoiced
J-26-1662 Roy Hill Holdings Newman — main site Supply — wall mounted flexi-hose extraction arm ø160 × 3 m Greg Albert 16 July 2025 $26,841 Invoiced
J-26-1661 Gas & Supplies WA Bibra Lake — main site Supply — overhead exhaust rail system, 6 m Zac Albert 07 July 2025 $20,834 Invoiced
J-26-1660 Austal Ships Henderson — main site Supply — aerovent axial flow fan ø500 Nicola Rock 03 July 2025 $7,621 Invoiced
J-26-1659 Alcoa of Australia Pinjarra refinery — maintenance Supply — downdraft bench 1200 × 800 Greg Albert 23 June 2025 $20,979 Invoiced
J-26-1658 South32 Worsley Alumina Collie — main site Spares and filters — cartridge filter, uni 2.2/3.2 series Zac Albert 19 June 2025 $15,317 Invoiced
J-26-1657 Northern Territory Safety Supplies Winnellie — main site Supply — cleaning station hose assembly, 3 m Nicola Rock 11 June 2025 $24,834 Invoiced
J-26-1656 CSBP Limited Kwinana AN plant — change house Supply, install and electrical — jetblack bh03 personnel cleaning booth, powder coated Zac Albert 30 May 2025 $34,767 Invoiced
J-26-1655 Northern Territory Safety Supplies Winnellie — main site Spares and filters — vehicle exhaust hose ø100, high temperature Greg Albert 16 May 2025 $6,558 Invoiced
J-26-1654 Hale School Wembley Downs — main site Supply and install — downdraft bench 1800 × 900 Greg Albert 12 May 2025 $21,530 Invoiced
J-26-1653 Fortescue Port Hedland Operations Port Hedland — main site Supply — pressed bend 90° ø200 Nicola Rock 05 May 2025 $6,359 Invoiced
J-26-1652 Department of Education WA Belmont City College — metalwork Supply — bottle and can drying tunnel, 2.4 m Greg Albert 21 Apr 2025 $44,189 Invoiced
J-26-1651 Total Tools Malaga Malaga — main site Supply, install and electrical — downdraft bench 1800 × 900 Zac Albert 09 Apr 2025 $17,747 Invoiced
J-26-1650 Coventry Group Malaga Malaga — main site Spares and filters — safety air nozzle, standard Nicola Rock 01 Apr 2025 $6,361 Invoiced
J-26-1649 Austal Ships Shipyard weld shop Supply — evo2.2 compact portable welding fume extractor, 2 m aluminium arm Nicola Rock 24 Mar 2025 $14,959 Invoiced
J-26-1648 City of Canning Operations Centre Canning Vale — main site Spares and filters — air knife plenum and manifold set Nicola Rock 18 Mar 2025 $8,009 Invoiced
J-26-1647 Water Corporation Balcatta water treatment workshop Spares and filters — auto-start welding current sensor Nicola Rock 03 Mar 2025 $12,870 Invoiced
J-26-1645 Total Tools Malaga Malaga — main site Spares and filters — air knife plenum and manifold set Greg Albert 21 Feb 2025 $8,845 Invoiced
J-26-1646 WA Steel Fabricators Kwinana Beach — main site Supply — arhv vehicle exhaust hose reel with fan, 10 m hose Nicola Rock 26 Feb 2025 $23,920 Invoiced
J-26-1644 Coventry Group Malaga Malaga — main site Supply — armotech ø160 aluminium extraction arm, 2 m Zac Albert 10 Feb 2025 $4,928 Invoiced
J-26-1643 Central Regional TAFE Geraldton Geraldton — main site Spares and filters — replacement motor 11 kw b14 flange Nicola Rock 31 Jan 2025 $18,582 Invoiced
J-26-1642 WesTrac Guildford Guildford component rebuild shop Supply — pressed bend 90° ø160 Greg Albert 22 Jan 2025 $5,972 Invoiced
J-26-1641 CSBP Limited Kwinana ammonia plant — maintenance workshop Supply — p-max welding extraction fan 0.75 kw 3 ph Zac Albert 15 Jan 2025 $21,761 Invoiced
J-26-1640 South32 Worsley Alumina Worsley refinery — boilermaker shop Spares and filters — hepa h13 secondary filter Nicola Rock 08 Jan 2025 $13,843 Invoiced
J-26-1639 Blackwoods Welshpool Welshpool — main site Supply — downdraft bench 1800 × 900 Zac Albert 30 Dec 2024 $9,630 Invoiced
J-26-1638 VEEM Ltd Canning Vale — main site Supply, install and electrical — jetblack wall mounted personnel cleaning station, 2.2 kw Zac Albert 23 Dec 2024 $29,619 Invoiced
J-26-1637 CSBP Limited Kwinana AN plant — change house Supply and install — aer201 portable fume extractor Nicola Rock 18 Dec 2024 $13,058 Invoiced
J-26-1636 Civmec Construction & Engineering Australian Marine Complex fabrication hall Supply and install — exhaust hose reel, 10 m Zac Albert 09 Dec 2024 $19,197 Invoiced
J-26-1635 South32 Worsley Alumina Collie — main site Supply and install — elemax portable vehicle exhaust fume extractor Nicola Rock 28 Nov 2024 $18,988 Invoiced
J-26-1634 Northern Territory Safety Supplies Winnellie — main site Supply and install — downdraft bench 1800 × 900 Nicola Rock 22 Nov 2024 $32,446 Invoiced
J-26-1633 Fortescue Port Hedland Operations Port Hedland — machine shop Supply — downdraft bench 1800 × 900 Zac Albert 18 Nov 2024 $16,000 Invoiced
J-26-1632 Blackwoods Welshpool Welshpool — main site Supply and install — downdraft bench 1200 × 800 Nicola Rock 12 Nov 2024 $24,958 Invoiced
J-26-1631 Fortescue Port Hedland Operations Port Hedland — machine shop Supply — jetblack bh03 personnel cleaning booth, powder coated Nicola Rock 01 Nov 2024 $18,929 Invoiced
J-26-1630 SA Ventilation Supplies Wingfield — main site Supply — downdraft bench 1800 × 900 Greg Albert 23 Oct 2024 $13,850 Invoiced
J-26-1629 Blackwoods Welshpool Welshpool — main site Spares and filters — differential pressure switch Greg Albert 14 Oct 2024 $10,442 Invoiced
J-26-1628 Civmec Construction & Engineering Henderson — main site Supply — uni 2.2h mobile welding fume extractor, 3 m aluminium arm Nicola Rock 07 Oct 2024 $20,141 Invoiced
J-26-1626 Blackwoods Welshpool Welshpool — main site Spares and filters — booth filter set, bh05 series Greg Albert 18 Sept 2024 $10,378 Invoiced
J-26-1627 Coventry Group Malaga Malaga — main site Supply — uni 2.2h mobile welding fume extractor, 3 m aluminium arm Nicola Rock 26 Sept 2024 $23,652 Invoiced
J-26-1625 Roy Hill Holdings Roy Hill mine — heavy vehicle workshop Supply — aer201 portable fume extractor Nicola Rock 13 Sept 2024 $26,574 Invoiced
J-26-1624 Roy Hill Holdings Roy Hill mine — heavy vehicle workshop Supply — jetblack wall mounted personnel cleaning station Greg Albert 06 Sept 2024 $15,288 Invoiced
J-26-1623 BHP Nickel West Kalgoorlie Kalgoorlie smelter — maintenance Supply — wall mounted flexi-hose extraction arm ø160 × 3 m Greg Albert 30 Aug 2024 $12,563 Invoiced
J-26-1622 Austal Ships Shipyard weld shop Supply — arhv vehicle exhaust hose reel with fan, 10 m hose Nicola Rock 19 Aug 2024 $13,922 Invoiced
J-26-1621 Alcoa of Australia Kwinana — main site Supply — uni 3.2 mobile welding fume extractor, 3 ph Zac Albert 12 Aug 2024 $33,447 Invoiced
J-26-1620 Newmont Boddington Gold Boddington — main site Spares and filters — hepa h13 secondary filter Zac Albert 05 Aug 2024 $3,492 Invoiced
J-26-1619 CSBP Limited Kwinana ammonia plant — maintenance workshop Supply — uni 2.2h mobile welding fume extractor, 3 m aluminium arm Nicola Rock 24 July 2024 $35,050 Invoiced
J-26-1618 Coventry Group Malaga Malaga — main site Supply — overhead exhaust rail system, 6 m Nicola Rock 19 July 2024 $23,325 Invoiced
J-26-1617 South Metropolitan TAFE Rockingham campus — metal trades Supply and install — evo 3.2 welding fume extractor, 4 m arm, 3ph Nicola Rock 15 July 2024 $29,159 Invoiced
J-26-1616 Roy Hill Holdings Newman — main site Supply — downdraft bench 1800 × 900 Nicola Rock 05 July 2024 $18,546 Invoiced
J-26-1615 CBH Group Kwinana Terminal Kwinana Beach — main site Supply — aci air knife 900 mm, stainless Greg Albert 24 June 2024 $13,928 Invoiced
J-26-1614 Kleenheat Gas Kwinana — main site Supply — uni 3.2 mobile welding fume extractor, 3 ph Greg Albert 18 June 2024 $31,834 Invoiced
J-26-1613 BHP Nickel West Kalgoorlie Kalgoorlie — main site Spares and filters — f9 panel filter 287 × 592 Greg Albert 10 June 2024 $1,807 Invoiced
J-26-1612 Northern Territory Safety Supplies Winnellie — main site Supply and install — jetblack bh03 personnel cleaning booth, powder coated Nicola Rock 05 June 2024 $33,036 Invoiced
J-26-1611 Geraldton Engineering Works Geraldton — main site Supply — bottle and can drying tunnel, 2.4 m Zac Albert 29 May 2024 $50,830 Invoiced
J-26-1609 SA Ventilation Supplies Wingfield — main site Supply — p-max welding extraction fan 0.75 kw 1 ph Zac Albert 13 May 2024 $13,808 Invoiced
J-26-1610 Gas & Supplies WA Bibra Lake — main site Spares and filters — cartridge filter, uni 2.2/3.2 series Greg Albert 20 May 2024 $10,505 Invoiced
J-26-1608 Fortescue Port Hedland Operations Port Hedland — main site Supply, install and electrical — evo2.2 compact portable welding fume extractor, 2 m aluminium arm Zac Albert 02 May 2024 $17,365 Invoiced
J-26-1607 South Metropolitan TAFE Rockingham — main site Supply — jetblack wall mounted personnel cleaning station, 2.2 kw Greg Albert 22 Apr 2024 $19,261 Invoiced
J-26-1606 Coventry Group Malaga Malaga — main site Spares and filters — air knife plenum and manifold set Greg Albert 10 Apr 2024 $4,153 Invoiced
J-26-1605 Alcoa of Australia Kwinana — main site Supply — auto-start welding current sensor Greg Albert 02 Apr 2024 $41,801 Invoiced
J-26-1604 South32 Worsley Alumina Worsley refinery — boilermaker shop Spares and filters — replacement impeller ø315 Nicola Rock 25 Mar 2024 $13,919 Invoiced
J-26-1603 Newmont Boddington Gold Boddington — HV workshop Supply — aer201 portable fume extractor Nicola Rock 18 Mar 2024 $10,379 Invoiced
J-26-1602 City of Canning Operations Centre Canning Vale — main site Supply — evo 3.2 welding fume extractor, 4 m arm, 3ph Zac Albert 05 Mar 2024 $11,768 Invoiced
J-26-1600 Roy Hill Holdings Roy Hill camp — laundry de-dust Supply — evo2.2 compact portable welding fume extractor, 2 m aluminium arm Nicola Rock 19 Feb 2024 $20,441 Invoiced
J-26-1601 Roy Hill Holdings Roy Hill mine — heavy vehicle workshop Supply — evo 3.2 welding fume extractor, 4 m arm, 3ph Nicola Rock 23 Feb 2024 $10,793 Invoiced
J-26-1599 Total Tools Malaga Malaga — main site Supply and install — jetblack wall mounted personnel cleaning station, 2.2 kw Zac Albert 12 Feb 2024 $24,973 Invoiced
J-26-1598 Alcoa of Australia Kwinana refinery — mechanical workshop Supply — aer201 portable fume extractor Nicola Rock 30 Jan 2024 $7,225 Invoiced
J-26-1597 Total Tools Malaga Malaga — main site Supply — jetblack stainless personnel cleaning booth Greg Albert 16 Jan 2024 $53,686 Invoiced
J-26-1596 Coventry Group Malaga Malaga — main site Supply and install — jetblack wall mounted personnel cleaning station, 2.2 kw Nicola Rock 08 Jan 2024 $25,682 Invoiced
J-26-1595 Civmec Construction & Engineering Henderson Yard 2 — heavy bay Spares and filters — vehicle exhaust hose ø100, high temperature Zac Albert 04 Jan 2024 $9,845 Invoiced
J-26-1594 Geraldton Engineering Works Geraldton — main site Supply, install and electrical — jetblack bh03 personnel cleaning booth, powder coated Nicola Rock 25 Dec 2023 $42,340 Invoiced
J-26-1593 Department of Education WA Bunbury SHS — trades training centre Breakdown attendance Zac Albert 12 Dec 2023 $3,461 Invoiced
J-26-1592 Kleenheat Gas Kwinana — main site Spares and filters — booth filter set, bh05 series Nicola Rock 30 Nov 2023 $11,603 Invoiced
J-26-1591 Hale School Wembley Downs — main site Supply — jetblack portable personnel cleaning station Greg Albert 24 Nov 2023 $14,645 Invoiced
J-26-1589 CSBP Limited Kwinana ammonia plant — maintenance workshop Supply — arhv vehicle exhaust hose reel with fan, 10 m hose Nicola Rock 13 Nov 2023 $18,373 Invoiced
J-26-1590 CSBP Limited Kwinana ammonia plant — maintenance workshop Spares and filters — cleaning station hose assembly, 3 m Nicola Rock 20 Nov 2023 $13,789 Invoiced
J-26-1588 Kleenheat Gas Kwinana — main site Spares and filters — round tailpipe nozzle with clamp Greg Albert 02 Nov 2023 $2,894 Invoiced
J-26-1587 Gas & Supplies WA Bibra Lake — main site Supply, install and electrical — jetblack hybrid personnel cleaning booth bh05-c-3 Nicola Rock 23 Oct 2023 $42,004 Invoiced
J-26-1586 VEEM Ltd Canning Vale — main site Supply — apn2 wall mounted vehicle exhaust extractor, double, 10 m hose Zac Albert 16 Oct 2023 $33,058 Invoiced
J-26-1585 Total Tools Malaga Malaga — main site Supply — downdraft bench 1200 × 800 Nicola Rock 12 Oct 2023 $13,079 Invoiced
J-26-1584 Civmec Construction & Engineering Australian Marine Complex fabrication hall Supply — evo2.2 compact portable welding fume extractor, 2 m aluminium arm Nicola Rock 04 Oct 2023 $8,365 Invoiced
J-26-1583 Blackwoods Welshpool Welshpool — main site Supply — jetblack wall mounted personnel cleaning station Zac Albert 22 Sept 2023 $12,686 Invoiced
J-26-1582 Coventry Group Malaga Malaga — main site Supply, install and electrical — electrical installation — isolators, cabling and connection by others Zac Albert 13 Sept 2023 $14,076 Invoiced
J-26-1580 Blackwoods Welshpool Welshpool — main site Supply — uni 3.2 mobile welding fume extractor, 3 ph Zac Albert 25 Aug 2023 $13,993 Invoiced
J-26-1581 Gas & Supplies WA Bibra Lake — main site Supply — jetblack portable personnel cleaning station Greg Albert 04 Sept 2023 $12,023 Invoiced